We surveyed 15 customers across all commercial building segments in the period September to November 2012. Here is what they have to say:
Power shortage is not a serious issue with customers in Bangalore. Customers do not depend too much on DG sets.
Units consumed from Grid and DG set
DG/Grid usage in Bangalore |
---|
Source: New Ventures India Surveys. Numbering is in continuation from the “Customers in Chennai and Madurai” section. The 15 data sets for Bangalore include offices, educational institutes, hotels and hospitals. Surveys conducted September to November 2012
Running the DG set is expensive but the small number of hours a DG set is run pushes up weighted average costs marginally.
Outage during operating hours when DG sets have to be used is considered – referred to as outage hours.
Unit power cost from DG set vs. Grid
Cost of electricity from DG vs. Grid in Bangalore (Rs/kWh) |
---|
Source: New Ventures India Surveys. Numbering is in continuation from the “Customers in Chennai and Madurai” section. The 15 data sets for Bangalore include offices, educational institutes, hotels and hospitals. Surveys conducted September to November 2012
Weighted average cost of electricity
Unit cost of electricity (DG+Grid) in Bangalore (Rs/kWh) |
---|
Source: New Ventures India Surveys. Numbering is in continuation from the “Customers in Chennai and Madurai” section. The 15 data sets for Bangalore include offices, educational institutes, hotels and hospitals. Surveys conducted September to November 2012
Customers are not that concerned about their power prices and therefore have not been investing in Renewable Energy or Energy Efficiency technologies.
Technology | Penetration amongst surveyed organizations |
---|---|
LED | None of the 15 places we interviewed had 100% replacement. 5 had partially replaced their lights with LEDs and 10 have not yet done anything |
Solar water heater | 4 of the 9 places which had hot water requirements used solar water heaters. Remaining 6 places did not have hot water requirements |
Source: New Ventures India Surveys. Numbering is in continuation from the “Customers in Chennai and Madurai” section. The 15 data sets for Bangalore include offices, educational institutes, hotels and hospitals. Surveys conducted September to November 2012
Customers have perception issues
We asked customers, who are not using specific technologies, and here are the top reasons for their hesitation:
Renewable Energy /Energy Efficiency | Top reasons why customers have not used these technologies in Bangalore |
---|---|
LED lights |
|
Solar Water Heaters |
|
Solar PV |
|
More worrying, Customers have usage issues
We asked customers, who are using specific technologies, and here are the top usage issues they have experienced:
Renewable Energy /Energy Efficiency | Top issues that customers have faced in Bangalore |
---|---|
LED Lighting |
|
Solar Water Heater |
|
At the same time customers have started experiencing real benefits
We asked customers, who are using specific technologies, and here is what they had to say:
Renewable Energy /Energy Efficiency | Top benefits customers are deriving in Bangalore |
---|---|
LED Lighting |
|
Solar Water Heater |
|
Partner Opportunities